Thermal Power Plants Variable Unit Cost
Variable Unit Cost (VUC) of thermal power plants considered in the Monthly Operation Program, as used in the execution of the DECOMP model
This table contains one row per thermal power plant per operating week and ONS revision cycle, with data for Brazil from December 2019 to March 2024. It tracks the Variable Unit Cost (CVU) used in the DECOMP model for the Monthly Operation Program (PMO). Note that the CVU is determined by the ONS during PMO cycles and may vary by revision within the same month.
- Described
- by Base dos Dados, Evidence model
- Publisher
- Operador Nacional do Sistema Elétrico (ONS)
- Dataset
- Estimates of the operating costs of the National Interconnected System (SIN) and other subsystems
- Source page
- basedosdados.org
- Licence
- Unknown · reuse unknown
- Period
- 2019-12-28 to 2024-03-02 (by day) · by Base dos Dados
- Area
- Brazil
- Grain
- one row per thermal power plant (establishment) per operating week and PMO revision · verified on the data
- Rows
- 21,351
- Source updated
- 2026-04-29
- Topics
- Infrastructure and transportation
- Catalog level
- L2 · structured
How to use
Connect your agent to Evidence's MCP server and ask in plain language. The agent finds this table, reads its columns and caveats, and runs the query for you.
claude mcp add --transport http -s user evidence \
https://mcp.evidence.so/mcp \
--header "Authorization: Bearer $MCP_API_KEY"Then ask, for example:
What was the average VUC value for thermal power plants per month in 2022?
Columns (13)
| Name | Type | Role | Description | Meaning |
|---|---|---|---|---|
| data_inicio | date | time | Data de início da semana operativa | Time: event, by day |
| ano | integer | time | Ano de início da semana operativa | Time: event, by year |
| mes | integer | time | Mês de início da semana operativa | Time: event, by month |
| data_fim | date | time | Data de fim da semana operativa | Time: event end, by day |
| ano_pmo | integer | time | Ano de Referência do Programa Mensal de Operação (PMO) | Time: reference period, by year |
| mes_pmo | integer | time | Mês de referência do PMO | Time: reference period, by month |
| numero_revisao | integer | measure | Número da revisão PMO | — |
| semana_operativa | string | dimension | Nome do estudo da semana operativa | — |
| id_modelo_usina | string | reference | Código da usina nos modelos de planejamento | — |
| id_subsistema | string | reference | Identificador do subsistema da usina | — |
| subsistema | string | dimension | Nome do subsistema da usina | — |
| usina | string | dimension | Nome da usina | — |
| custo_variavel_unitario | decimal | measure | Valor do Custo Variável Unitário (CVU) | — |
Caveats
methodology · custo_variavel_unitario, numero_revisao
Curated by Evidence · full text through the MCP